Santa Fe Dam Tunnel, Irwindale, CA
The scope of services provided the
Upper San Gabriel Valley Municipal Water District Prepared involved
design, cost estimate, and design report for a 1,000-foot pressure
tunnel under San Gabriel Dam. The tunnel was to be constructed
in geology consisting of sand, gravel and cobbles.
|
| |
|
|
| |
 |
Gurley Reservoir Dam, Norwood, CO
The scope of services involved performing
construction phase services including all aspects of design implementation
and construction documentation for the installation of a triple-row
grout curtain, outlet tunnel and pipe rehabilitation / replacement.
Conformation investigations included rock coring and extensive
water pressure (packer) testing of grouted bedrock permeability
characteristics for comparison to pre-repair values.
|
| |
|
|
| |
 |
Echo Lake Dam Rehabilitation Project,
CA
The Echo Lake Dam Rehabilitation
Project was the first roller compacted concrete dam structure
built in California. The scope of services included the investigation
of the existing dam for safety and stability, designing conceptual
alternatives for rehabilitation / replacement, and removing the
existing structure and rebuilding it using the RCC design.
|
| |
|
|
| |
 |
Diamond Valley Reservoir, Hemet, CA
The work included acting as a member
of the Post Design Team, which involved conducting quality control
measures, settling design conflicts, monitoring construction for
adherence to design intent, and preparing the final completion
reports for the project's three embankment dams.
|
| |
|
|
|