








Integration of 3D modeling with other digital design information from various project disciplines creates a collaborative project environment and:
- Produces a better coordinated design.
- Identifies potential conflicts and allows the design team to address issues early on.
- Reduces costs and potential re-work.
- Ultimately, savings can be realized by shorter project duration, decreased claims and litigation.
Using the inherent intelligence of BIM and VDC provides a more scientific approach to the design process. We call this a smart way of “Creating Space Underground”.
You are invited to contact our BIM/VDC leader Jake Koelliker to learn more about how Brierley Associates can help you with the planning, design, and construction management of your next project.

Jake Koelliker
BIM Leader
460 East 300 South
Suite 5
Kanab, UT 84741
435.222.1159